A campaign misses part of its agreed delivery. The proposed remedy is “more impressions next month.” That leaves several questions unanswered: which impressions, for which audience, during what period, and against which original commitment?

A makegood is replacement delivery agreed between the parties. The operational task is to translate that agreement into something that can be booked, verified, and reconciled. The commercial owner determines the remedy under the applicable agreement.

Describe the shortfall precisely

Record the original booking, approved changes, billable metric, reporting source, and affected period. Separate confirmed underdelivery from a reporting discrepancy that is still being investigated.

Suppose a fictional booking calls for 500,000 impressions and the agreed final source confirms 450,000. The quantity difference is 50,000. That arithmetic does not determine whether 50,000 impressions in a different placement provide an acceptable replacement.

If the issue concerns targeting, format, or quality rather than quantity, say so. Additional volume may not address the original problem.

Write the replacement as a small media plan

Specify the replacement dates, inventory, audience, format, quantity, measurement source, and acceptance criteria. Identify any differences from the original booking.

A seasonal promotion may have ended. Delivering the same creative after expiry could create a new customer problem. Confirm the replacement message and destination before scheduling it.

The inventory-forecasting guide helps assess whether the proposed replacement is actually available. Do not promise a second commitment that depends on the same unsupported assumptions as the first.

Keep approval and trafficking connected

Save the agreed remedy reference with the new delivery configuration. Use stable IDs to connect the original campaign and replacement line items.

Avoid overwriting the original goal or historical report to make the campaign appear complete. The record should show what happened during the booked flight and what was delivered afterward.

A practical handoff contains:

  • Original campaign and affected commitment.
  • Approved replacement scope and dates.
  • Creative and destination versions.
  • Responsible commercial and operations owners.
  • Reporting and billing treatment.
  • Conditions for confirming completion.

A new operator should be able to traffic the plan without interpreting a vague email promise.

Reconcile the replacement separately

Track replacement delivery against its own approved goal, then connect the result back to the original issue. Keep it distinguishable from paid activity running at the same time.

Confirm how credits, invoices, and replacement volume interact with the commercial owner. Do not assume that issuing extra impressions automatically resolves a pending billing adjustment.

The month-end reconciliation guide provides a place to track unresolved amounts and ownership.

Close the item when the agreed evidence supports completion, and retain any remaining exceptions. A useful makegood record explains both the original gap and the actual remedy. It should not require rewriting history to make the totals look orderly.